Project Overview
260 kW Capstone Microturbine CHP System was commissioned in October 2018, has been producing heat and power to the facility ever since.
1,450,000 kwh generated since December 2018
238,000 cubic metres of natural gas offset
Provides emergency backup power during power outages
The 260 kW Capstone Microturbine CHP System
Was commissioned in October 2018, and will act as an emergency backup generator for the building, while also supplying electricity and heat. The system increases the energy efficiency of the building, while providing a return on investment on a backup generator.